Azure → GCP Migration

Migrate from Azure to Google Cloud
without interruptions

Experts in migrating AKS to GKE, Azure SQL to Cloud SQL and your entire Azure infrastructure to Google Cloud Platform. Google certified.

40% average savings

0% downtime

Certified partner

Azure vs GCP

Why migrate from Azure to Google Cloud

We compare the main differences and advantages of migrating your infrastructure

Kubernetes Migration

Azure

AKS

GCP

GKE

  • GKE Autopilot: automatic node management without configuration
  • Native integration with Cloud Build and Artifact Registry
  • More efficient auto-scaling and competitive pricing
  • Anthos Service Mesh included at no additional cost
  • Multi-cloud support with Anthos (Azure, AWS, on-prem)

Database Migration

Azure

Azure SQL

GCP

Cloud SQL

  • Up to 40% cheaper pricing for similar workloads
  • Automatic backups with no extra storage cost
  • Regional high availability without complex configuration
  • Point-in-time recovery with no retention limits
  • Simplified migration with Database Migration Service

Cost Optimization

Google Cloud offers significant cost advantages vs Azure:

  • Automatic sustained use discounts (no reservations)
  • Preemptible VMs up to 91% cheaper than normal VMs
  • Free networking between zones in the same region
  • No data egress costs within GCP
Our services

Specialized migration services

Complete infrastructure migration with zero downtime

Kubernetes Migration

AKS → GKE

We migrate your Kubernetes clusters from Azure AKS to Google Kubernetes Engine with blue-green or canary strategies.

  • Dependency and compatibility analysis
  • Migration of manifests and Helm charts
  • CI/CD configuration in Cloud Build
  • Persistent volumes migration (Azure Disk → GCE PD)
  • Anthos Service Mesh implementation
  • Comprehensive pre and post migration testing

Database Migration

Azure SQL → Cloud SQL

We migrate your SQL databases (SQL Server, PostgreSQL, MySQL) from Azure to Cloud SQL without data loss.

  • Google Database Migration Service
  • Real-time pre-migration synchronization
  • Data integrity validation
  • Users and permissions migration
  • Index and query optimization
  • Detailed rollback plan

Networking & Security

VNet Migration

We configure your network infrastructure on Google Cloud with security best practices.

  • VPC and subnets design
  • Cloud Load Balancing configuration
  • Network Security Groups to Firewall Rules migration
  • Cloud Armor (WAF) implementation
  • Hybrid VPN or Cloud Interconnect with Azure
  • IAM and Service Accounts configuration

Monitoring & Logging

Azure Monitor → Cloud Operations

We configure Cloud Monitoring and Cloud Logging for complete infrastructure observability.

  • Azure Monitor dashboards migration
  • Alerts and notifications configuration
  • Log analytics with BigQuery
  • APM with Cloud Trace and Cloud Profiler
  • Integration with Grafana and Prometheus
  • SLOs and error budgets
Our process

4-phase migration process

Proven methodology for risk-free migrations

1

Audit & Planning

1-2 weeks

We analyze your current Azure infrastructure and design the target architecture on GCP.

  • Complete Azure resources inventory
  • Dependency and compatibility analysis
  • Equivalent GCP architecture design
  • Cost estimation and TCO
  • Detailed migration timeline
2

Testing Environment

2-3 weeks

We create a testing environment on GCP and migrate a replica of your infrastructure.

  • GCP project and organization setup
  • Test cluster/database migration
  • Functionality and performance testing
  • Configuration adjustments and optimization
  • Documentation of necessary changes
3

Progressive Migration

3-6 weeks

We migrate your production infrastructure gradually with zero-downtime strategies.

  • Data migration with continuous synchronization
  • Applications deployment on GCP
  • Progressive traffic switchover (canary)
  • Real-time monitoring
  • Production functionality validation
4

Optimization & Closure

1-2 weeks

We optimize resources, validate savings and shut down Azure infrastructure.

  • Instances and resources rightsizing
  • Optimal auto-scaling configuration
  • Real vs estimated costs analysis
  • Team training on GCP
  • Azure resources decommissioning
Why choose us

Benefits of migrating with Kettu Studio

Experience and guarantees that make the difference

Google Cloud Certified Partner

We are a Google Cloud Partner with Professional Cloud Architect and Professional DevOps Engineer certifications.

+50 Successful Migrations

We have migrated over 50 infrastructures from Azure and AWS to Google Cloud without incidents.

Cost Savings Guarantee

We guarantee the savings estimated in the initial audit or refund the difference.

Zero Downtime Guaranteed

Proven blue-green migration methodology to guarantee 100% uptime.

Post-Migration Support

We include 1-6 months of support to resolve issues and optimize your infrastructure.

Training & Documentation

We train your team and deliver complete documentation of the new architecture.

Plans

Migration plans tailored to your company

Choose the plan that best fits your infrastructure size

Starter

Ideal for startups and small projects

From €5,000

  • 1-2 AKS clusters
  • Up to 3 databases
  • Network and security migration
  • 1 month post-migration support
  • Basic documentation
  • 4-hour training
Request quote
Most popular

Business

For growing companies

From €15,000

  • 3-5 AKS clusters
  • Up to 10 databases
  • Complete infrastructure migration
  • 3 months post-migration support
  • Complete documentation
  • 16-hour training
  • Cost optimization included
Start now

Enterprise

For large corporations

Custom

  • Unlimited clusters
  • Unlimited databases
  • Multi-region and multi-project
  • 6 months premium support
  • Enterprise documentation
  • Unlimited personalized training
  • Dedicated support team
  • Custom SLA
Contact us
FAQ

Frequently asked questions

We answer your questions about migration

How long does the Azure to GCP migration take?

It depends on the size of your infrastructure. A typical migration takes 6-12 weeks, including planning, testing and gradual migration. We provide a detailed timeline after the initial audit.

Will there be downtime during migration?

No. We use blue-green migration strategies and progressive switchover to guarantee zero downtime. Your users won't notice any service interruption.

Can I keep some services on Azure?

Yes. We can configure a multi-cloud hybrid architecture using Anthos, allowing you to keep certain services on Azure while migrating others to GCP.

Will I really save money migrating to GCP?

Yes. On average, our clients save between 30-40% on infrastructure costs when migrating from Azure to GCP. We do a TCO analysis before migration and guarantee the estimated savings.

What about my Microsoft licenses?

If you use SQL Server or other Microsoft products, we evaluate options: migrate to open-source alternatives (PostgreSQL, MySQL), use Cloud SQL with SQL Server, or maintain licenses with BYOL (Bring Your Own License).

What support do I get after migration?

We include 1-6 months of support (depending on plan) to resolve any issues, optimize resources and answer questions. We also offer managed services if you need them.

Ready to migrate to Google Cloud?

Request a free audit and discover how much you can save migrating from Azure to GCP

No commitment · 24h response